KERUI supports Ethiopian developers, contractors and elevator companies with project-specific selection, China procurement, export packing, installation coordination and lifecycle spare-parts planning.
Market context / project information is stated separately
Reference9 elevators
Highest zone32 floors / 128 m
ConfigurationMRL, group and duplex
01
Configured for the building, not from a generic catalogue
Mixed-use and high-rise projects need separate traffic zones, suitable loads and speeds, and a control strategy matched to the building programme. We review the shaft schedule, floor use, expected traffic, electrical supply and delivery sequence before final equipment selection.
Passenger, freight and panoramic elevators
Machine-room and machine-room-less arrangements
Simplex, duplex and group-control planning
Escalators, moving walks and replacement parts
02
Export delivery prepared for East African site conditions
The procurement package should account for transport, storage, power quality, installation capability and future maintenance. Technical documents and packing lists are coordinated so the local project team can verify interfaces before the shipment leaves China.
Voltage and backup-power review
Moisture-resistant export packing and loading plans
Installation tools, consumables and project spares
Remote or agreed onsite technical guidance
03
Information needed for an Ethiopia quotation
A reliable quotation starts with a verified technical brief. If shaft details are still being developed, we can begin with the building type and traffic requirement and then identify the missing decisions.
Project city, building use and construction schedule
Quantity, rated load, speed, floors, stops and openings
Shaft, pit and overhead dimensions
Power supply, finishes, standards and delivery terms