Ethiopia Commercial Complex Elevator Project: Zoned Selection and Export Delivery

Nine elevators were organized into four differentiated groups serving 9-, 13-, 25- and 32-storey building zones. The configuration responds to mixed-use traffic, different shaft conditions and high-rise travel requirements.

elevator selectionChina elevator procurementoverseas elevator installationoverseas elevator project reference
Equipment9 elevators
Configuration4 elevator groups
Highest zone32 floors / 128 m
MarketEthiopia, Africa

PROJECT OVERVIEW

From building requirements to a deliverable solution

A commercial complex should not be treated as one uniform traffic zone. This project uses different loads, speeds and control arrangements to match the function and height of each building section.

The case illustrates Kerui's capability in elevator selection, China elevator procurement coordination and overseas project delivery for complex building programmes.

01 / ELEVATOR SELECTION

Zoned elevator selection

The selection process matched machine-room conditions, building height, traffic demand and control strategy for each zone.

  • Group A: 1 MRL elevator, 1,150 kg, 1.75 m/s, serving 9 floors
  • Group B: 3 MRL group-control elevators, 1,350 kg, 1.75 m/s, serving 13 floors
  • Group C: 3 machine-room group-control elevators, 1,000 kg, 2.0 m/s, serving 25 floors
  • Group D: 2 machine-room duplex elevators, 1,000 kg, 2.0 m/s, serving 32 floors

02 / CHINA PROCUREMENT

China elevator procurement and technical coordination

  • 01

    Review four equipment groups as a coordinated package while retaining zone-specific parameters.

  • 02

    Control revisions through a unified schedule of loads, speeds, stops, openings, control modes and shaft interfaces.

  • 03

    Plan manufacturing, packing and export batches to support the overseas construction sequence.

03 / OVERSEAS INSTALLATION

Overseas elevator installation and commissioning support

  • Interface review for MRL and machine-room elevator zones
  • Installation guidance for group-control and duplex systems
  • Testing, commissioning and acceptance coordination with the local project team

04 / OVERSEAS PERFORMANCE

Project value and overseas performance

Zoned configurations address different heights, spatial constraints and passenger demand.
Group control and duplex operation improve call response and capacity allocation.
The 128-metre highest zone demonstrates experience with high-rise overseas elevator projects.
Information note

Project names, locations, quantities and technical parameters are compiled from available project materials. The final service scope is subject to the contract and approved technical documents.