City context image / not a project-site photoGuinea Golden Crown Stadium Elevator Project: High-Capacity MRL Solution
Eight high-capacity machine-room-less elevators were supplied for a sports venue in central Conakry. A unified 1,600 kg specification supports concentrated event traffic and simplifies long-term maintenance planning.
PROJECT OVERVIEW
From building requirements to a deliverable solution
Sports venues experience short, concentrated passenger peaks before and after events. The elevator selection therefore prioritised capacity, fleet consistency and maintainability.
Kerui completed elevator sales and export support, together with overseas elevator installation guidance and acceptance coordination.
01 / ELEVATOR SELECTION
High-capacity elevator selection for a sports venue
A unified MRL solution reduces rooftop machine-room requirements and gives the local team one consistent technical standard to operate and maintain.
- 8 machine-room-less elevators with one unified specification
- 1,600 kg rated load and 1.5 m/s rated speed
- Each elevator serves 6 floors, 6 stops and 6 doors
- Multi-unit capacity supports event-time passenger surges
02 / CHINA PROCUREMENT
Elevator procurement from China and export delivery
- 01
Standardise the equipment schedule to reduce interface and spare-parts complexity.
- 02
Coordinate drawings, technical documents, production and export packing as one project package.
- 03
Arrange delivery information and installation materials for handover to the overseas site team.
03 / OVERSEAS INSTALLATION
Overseas elevator installation guidance
- Technical clarification before and during installation
- Support for installation quality checks and commissioning preparation
- Testing and acceptance coordination based on the agreed supply scope
04 / OVERSEAS PERFORMANCE
Project value and overseas performance
Project names, locations, quantities and technical parameters are compiled from available project materials. The final service scope is subject to the contract and approved technical documents.
Image: Boubacar Bila Diao Balde / Wikimedia Commons / CC BY-SA 4.0 ↗GLOBAL ELEVATOR PROJECT SUPPORT
Planning an overseas elevator project?
Share the building use, shaft data, floors, stops, load, speed, destination country and delivery schedule. We can support elevator selection and procurement from China.
KERUI