City context image / not a project-site photoYaoundé Hotel Elevator Project: Elevator Selection and China Procurement
Seven machine-room passenger elevators were configured for a 25-storey hotel in Yaoundé. The solution combines two rated-load classes with a unified 2.0 m/s speed to support guests, luggage and peak hotel traffic.
PROJECT OVERVIEW
From building requirements to a deliverable solution
This overseas elevator reference demonstrates how the building use, floor count, passenger profile and luggage demand can be translated into a practical vertical-transport plan.
Kerui supported the project through elevator selection, technical parameter coordination, elevator procurement from China and export-delivery preparation.
01 / ELEVATOR SELECTION
Elevator selection for hotel traffic
The elevator selection strategy separates high-capacity demand from routine passenger movement while retaining a consistent travel speed across the hotel.
- 3 machine-room passenger elevators: 1,600 kg rated load and 2.0 m/s rated speed
- 4 machine-room passenger elevators: 1,000 kg rated load and 2.0 m/s rated speed
- Two capacity classes support normal guest traffic, concentrated arrivals and passengers travelling with luggage
- Seven units create operational flexibility during occupancy peaks and scheduled maintenance
02 / CHINA PROCUREMENT
Elevator procurement from China
- 01
Confirm shaft dimensions, floor-to-floor heights, stops, openings, power supply and required finishes before final quotation.
- 02
Coordinate technical submittals, equipment schedules and interface drawings with the overseas project team.
- 03
Prepare packing, export documentation and delivery sequencing around the construction programme.
03 / OVERSEAS INSTALLATION
Overseas elevator installation support
- Pre-installation review of civil interfaces and equipment arrival conditions
- Remote or onsite technical guidance according to the agreed project scope
- Commissioning preparation, testing coordination and acceptance-document support
04 / OVERSEAS PERFORMANCE
Project value and overseas performance
Project names, locations, quantities and technical parameters are compiled from available project materials. The final service scope is subject to the contract and approved technical documents.
GLOBAL ELEVATOR PROJECT SUPPORT
Planning an overseas elevator project?
Share the building use, shaft data, floors, stops, load, speed, destination country and delivery schedule. We can support elevator selection and procurement from China.